Data Center Map Colocation Bare Metal Facilities Regions Providers Quotes Contact

Similar Data Centers (0)

General Information

Overview

Element Critical's facility delivers best-in-class data center design for fast deployment of critical capacity while maintaining a lower cost of operations. The building is designed to an LEED Gold standard and the FM I-150 roof system with concrete roof deck is designed to resist 190 mph hurricane-grade winds. Located in Houston's prestigious Energy Corridor, Houston One offers quick and easy access from the primary business centers.

Building Details

Network Providers

3 Carrier Neutral Meet-Me-Rooms

2 Diverse Conduit Entry Paths

Roof Rights Available

ATT

Consolidated Communications

Cogent

Crown Castle

Ezee Fiber

FiberLight

Hurricane Electric

LOGIX

Lumen Technologies

Phonoscope

PS Lightwave

Tampnet

Verizon

Zayo

Cloud On Ramp: Megaport

Amenities

No amenities listed

Media

No media available. See Element Critical Media.

Contact

Complete the form to get in your information reviewed by

Get Started Today

Register Your Email Address with ColoCapacity

{}
{"_geo": {"lat": 29.8015924, "lng": -95.8063269}, "amenities": ["Burn-in, Breakdown, \u0026 Storage Space", "Free High-Speed Wi-Fi", "Loading Dock - Storage Cages Raised Same Level As Corridors", "Dynamic Office Space", "Conference Rooms", "Kitchen/Break Room", "50 parking spaces", "Located on 10 acres", "Available expansion space"], "certifications": ["SOC 1 type 1 and 2", "SOC 2 Type 1 and 2", "NERCIP", "LEED Gold Certification"], "facility": {"address": "22000 FRANZ ROAD", "city": "Katy", "connectivity": {"hasHyperscale": false, "hasInterconnect": true, "hasRetail": true, "hasWholesale": true, "networkProviders": ["3 Carrier Neutral Meet-Me-Rooms", "2 Diverse Conduit Entry Paths", "Roof Rights Available", "ATT", "Consolidated Communications", "Cogent", "Crown Castle", "Ezee Fiber", "FiberLight", "Hurricane Electric", "LOGIX", "Lumen Technologies", "Phonoscope", "PS Lightwave", "Tampnet", "Verizon", "Zayo", "Cloud On Ramp: Megaport"]}, "country": "United States", "name": "Skybox Houston One Data Center", "overview": "Element Critical\u0027s facility delivers best-in-class data center design for fast deployment of critical capacity while maintaining a lower cost of operations. The building is designed to an LEED Gold standard and the FM I-150 roof system with concrete roof deck is designed to resist 190 mph hurricane-grade winds. Located in Houston\u0027s prestigious Energy Corridor, Houston One offers quick and easy access from the primary business centers.", "state": "Texas", "stateAbbr": "TX", "url": "NULL", "worldRegion": "northamerica", "yearBuilt": "NULL", "zipcode": "77449"}, "hasSecurity": true, "id": 726, "media": ["NULL"], "powerAndCooling": {"cooling": {"configuration": "Total Capacity: 4000 Tons, 4 400-Ton Air Cooled Chillers", "redundancy": "Unit Redundancy: N+1 and 2N Configurations Available, CRAH Configuration: N+1 and 2N Configurations Available"}, "density": "up to 50 kW and beyond with custom solutions", "standbyPower": {"configuration": "8 Diesel Generators, Diesel On-Site: 96 Hours of Backup Fuel", "redundancy": "NULL"}, "ups": {"configuration": "2N Configurations", "redundancy": "2N"}, "utilityFeeders": "Situated adjacent to 300MW Centerpoint Substation"}, "provider": "Element Critical", "providerId": 15, "providerLogo": "https://colo.nyc3.cdn.digitaloceanspaces.com/logos/element-critical.svg", "specifications": {"building": {"colocationSpace": 118248, "type": "NULL"}, "fireProtection": {"detection": "VESDA Smoke Detection", "suppression": "Pre-action Dual Interlock Dry Pipe Sprinkler System"}, "floodAndSeismic": {"floodZone": "NULL", "seismicRating": "NULL"}}, "uptime": "NULL"}